SOLAR ENERGY SYSTEM INSTALLATION PROJECT Steel construction was designed and assembled for 2724 solar panels on a total of 7500 square meters of factory roof.
CHIMNEY PRODUCTION Along with the production of refractor with a diameter of Ø1600, 2 steel chimneys with a height of 11 meters were manufactured.
DISTILATION COLUMN TRAY MANUFACTURING Distillation column with Ø5200 diameter and 1820 trays were manufactured.
STEEL CONSTRUCTION PIER Eight friction piles were driven into the seabed and a 10m-long steel construction pier was constructed.
MANUFACTURING OF ELBOW LEAKAGE APPARATUS Clamps and leakage repairing apparatus are manufactured in the diameter range of 1/2'' - 52''